Teaming with Conger Construction and Milford Schools, we were a part of building an entire new middle school to increase student capacity and as well as update most of the athletic fields, parking lots, and roadways around the entire middle school and high school campus. Our creative means and methods allowed for a significant tightening of the overall project schedule while keeping the active campus operating with little interruption. Our scope on this project included creative phasing of the earthwork and infrastructure to limit interruptions and save on overall costs for importing and exporting soil between phases allowing the school district to reallocate those funds to build much needed additional parking.